Analysis of the Two-Step Process Method in Project Risk AssessmentChinese Full Text
Gao WeiyiAssoc.Prof. School of Management, WUT, Wuhan 430070, China ,Peng Huatao
Abstract: This study combines the Analytical Hierarchy Process and Fuzzy Comprehensive Evaluation to evaluate project risk synthetically, which is called Two-step Process. It is most suitable for the project which has many alternatives to be selected. This can remedy the deficiencies of two types of approaches by not only selecting the most suitable alternative but also calculating the risk level of a scheme.
- Series:
(C) Architecture/ Energy/ Traffic/ Electromechanics, etc; (J) Economics & Management
- Subject:
History of Economic Theory and Ideology
- Classification Code:
F062.4
- Mobile Reading
Read on your phone instantly
Step 1
Scan QR Codes
"Mobile CNKI-CNKI Express" App
Step 2
Open“CNKI Express”
and click the scan icon in the upper left corner of the homepage.
Step 3
Scan QR Codes
Read this article on your phone.
- Download
- Online Reading
- AI Summary

Download the mobile appuse the app to scan this coderead the article.
Tips: Please download CAJViewer to view CAJ format full text.
Download: 381 Page: 238-240 Pagecount: 3 Size: 34k
Citation Network
Related Literature
- Similar Article
- Reader Recommendation
- Associated Author
- [1]层次分析法在项目风险管理中的应用[J]. 丁香乾,石硕. 中国海洋大学学报(自然科学版). 2004(01)
- [2]项目风险评估方法探讨[J]. 张桂新,蒋景楠. 技术经济. 2006(03)
- [3]用层次分析法确定技术分成率[J]. 邵俊岗. 技术经济. 1997(12)
- [4]利用层次分析法评价资源综合利用项目的社会效益[J]. 廖风华. 重庆交通学院学报. 1999(03)
- [5]大数据视角下经管学科实践类课程个人考核评价体系的构建[J]. 汪海鹏,仲旭,任婷婷,李江霞. 现代商贸工业. 2023(17)
- [6]层次分析法(AHP)在效益评价中的应用——1995年河南省各地市工业经济效益综合评价[J]. 金明. 郑州纺织工学院学报. 1997(03)