Analysis of the Two-Step Process Method in Project Risk AssessmentChinese Full Text

Gao WeiyiAssoc.Prof. School of Management, WUT, Wuhan 430070, China ,Peng Huatao

Abstract: This study combines the Analytical Hierarchy Process and Fuzzy Comprehensive Evaluation to evaluate project risk synthetically, which is called Two-step Process. It is most suitable for the project which has many alternatives to be selected. This can remedy the deficiencies of two types of approaches by not only selecting the most suitable alternative but also calculating the risk level of a scheme. 
  • Series:

    (C) Architecture/ Energy/ Traffic/ Electromechanics, etc; (J) Economics & Management

  • Subject:

    History of Economic Theory and Ideology

  • Classification Code:

    F062.4

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 381 Page: 238-240 Pagecount: 3 Size: 34k

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author